Party Wall surveyors · SK7 · Stockport

Party Wall Surveyors in Bramhall

Bramhall is a popular residential area within Stockport, known for its established neighbourhoods and attractive residential setting. We provide Party Wall advice to building owners and adjoining owners across Bramhall and the surrounding area.

At a glance

Bramhall planning facts

Postcode district
SK7
Borough
Stockport

Conservation areas

  • Bramall Park Conservation Area (designated 2005)
  • Bramhall Lane South Conservation Area (designated 2005)
  • Syddal Park Conservation Area (designated 2005)

All three Bramhall conservation areas are also subject to Article 4 directions, which can mean that alterations permitted elsewhere require planning permission here.

Bramhall area stats
Local knowledge

Homes and party walls in Bramhall

Bramhall has a mix of detached and semi-detached homes, with many properties set within larger plots. Rear and side extensions, garden rooms and other alterations are common types of work that can bring the Party Wall etc. Act 1996 into consideration.

Projects we see most in Bramhall

  • Rear and wrap-around extensions
  • Basements and swimming pool
  • Outbuildings and garden rooms
  • Excavation close to neighbouring buildings

How a party wall instruction works

  1. Project reviewDrawings and scope checked against sections 1, 2 and 6.
  2. Notice strategyWhich neighbours, which notices and when, to protect your programme.
  3. Serve noticesCorrectly drafted notices served on every adjoining owner.
  4. Schedule & awardThe neighbour's property recorded and the award agreed.
  5. Close-outPost-works check and sign-off.
Party Wall · for homeowners

Planning a project in Bramhall?

Which home improvements need a notice under the Party Wall etc. Act 1996

Rear extension

Needs notice if you build a new wall on or astride the boundary, or dig foundations within 3 m of a neighbour's building and deeper than theirs.

Sections 1 & 6Often

Side extension

Side returns and wrap-arounds usually sit on the boundary line and need new foundations right next to the neighbour's.

Sections 1 & 6Usually

Loft conversion

Cutting steel beams into the party wall, raising it or removing a shared chimney breast is work to a party wall.

Section 2Usually

Basement

Digging below your neighbour's foundations, and underpinning a shared wall, are both notifiable.

Sections 2 & 6Almost always

Excavation

Foundations, piling or deep drainage within 3 m of a neighbour's building, or within 6 m for deeper digs, can need notice.

Section 6Depends on depth

Structural alterations

Inserting beams into a shared wall, cutting in flashings or taking out a chimney breast on the party wall.

Section 2Usually
  • 1 month notice for new walls at the boundary and excavation
  • 2 months notice for work to an existing party wall
  • 14 days for the neighbour to reply
For professionals

Architects, designers & referrers

Bring Party Wall advice in at design stage, not after tender

Architects & design professionals

Residential architects, architectural technologists, designers, planning consultants, structural engineers and design-and-build practices.

  • Preliminary Party Wall assessments
  • Early identification of project risk
  • Technical guidance on notifiable works
  • CPD and educational sessions
  • A reliable referral pathway for your clients

Builders, surveyors & solicitors

Refer a client and we take notices, schedules of condition and awards off your programme.

  • Builders
  • Extension specialists
  • Loft conversion contractors
  • Surveyors
  • Solicitors
  • Project managers
  • Construction consultants
Adjoining owners

Received a Party Wall notice?

Your neighbour in Bramhall is planning work

You have 14 days to reply. If you don't, a dispute is assumed and surveyors are appointed. Your three options:

  1. ConsentAgree to the work. A schedule of condition is still wise.
  2. Agreed surveyorDissent and share one impartial surveyor.
  3. Own surveyorDissent and appoint your own surveyor.

The building owner normally pays the surveyors' reasonable fees, and must make good any damage the works cause.

Get impartial advice from Corelain
Quick answers

Party Wall questions in Bramhall

Based on the Party Wall etc. Act 1996

My Bramhall house is detached. Do I still need to follow the Party Wall Act?

Yes, potentially. A detached house can still be affected by the Party Wall etc. Act 1996. For example, excavation for an extension, basement or other works may be notifiable if it is within 3 metres of a neighbouring building and goes deeper than the bottom of its foundations. The Act can therefore apply even where the properties do not share a wall.

Do I need a party wall agreement for an extension in Bramhall?

Often, yes. You may need to serve a Party Wall Notice if the extension involves building a new wall on or astride the boundary, carrying out work to an existing party structure, or excavating close to a neighbouring building. Whether the Act applies depends on the location and design of the proposed works.

Does my neighbour's extension need a party wall notice?

Possibly. If your neighbour is building on or close to the boundary, carrying out work to a shared wall, or excavating close to your property and below the level of your foundations, the works may fall within the Party Wall etc. Act 1996.

How much notice do I need to give my neighbour?

Generally, one month's notice is required for building a new wall at the boundary or for qualifying excavation works. Two months' notice is generally required for works to an existing party structure.

What happens if my neighbour does not reply to a party wall notice?

If an adjoining owner does not respond within 14 days, a dispute is deemed to have arisen under the Act. Surveyors can then be appointed to deal with the notifiable works and, where required, agree a Party Wall Award.

I have received a party wall notice in Bramhall. What should I do?

Read the notice carefully and respond within the stated timeframe. You can consent to the works, or dissent and appoint a surveyor. The two owners can also agree to use one impartial surveyor, known as the agreed surveyor.

Do I have to pay for my own party wall surveyor?

Usually not. Where the works are solely for the benefit of the building owner, the building owner will normally be responsible for the reasonable costs of the adjoining owner's surveyor.

Can I start building before the Party Wall process is complete?

Not where notifiable works have not been properly dealt with. If the adjoining owner consents to the notice, a Party Wall Award may not be necessary. If a dispute arises, the relevant matters will normally need to be resolved before the notifiable works proceed.

What if my neighbour's building work damages my property?

Where surveyors are appointed, a Schedule of Condition will typically be prepared before the works begin. This provides a record of the adjoining property and can help establish whether damage has resulted from the works. The Party Wall Act also provides mechanisms for making good or compensating for damage caused by notifiable works.

Does planning permission cover party wall matters?

No. Planning permission, Building Regulations and the Party Wall etc. Act 1996 are separate requirements. Obtaining planning permission does not remove the need to comply with the Party Wall Act where the proposed works are notifiable.

Can I stop my neighbour's extension using the Party Wall Act?

The Party Wall Act is not normally a means of preventing lawful development. Its purpose is to regulate certain works and provide procedures and protections for both building owners and adjoining owners.

Greater Manchester

Party Wall surveyors across Trafford and Stockport

Local Party Wall guides for each focus area