Party Wall surveyors · SK7 · Stockport

Party Wall Surveyors in Hazel Grove

Hazel Grove is a popular residential area within Stockport, centred around the A6 and well connected to Stockport and Manchester. We provide Party Wall advice to building owners and adjoining owners across Hazel Grove and the surrounding area.

At a glance

Hazel Grove planning facts

Postcode district
SK7
Borough
Stockport

Conservation areas

  • None listed for this area

No conservation areas are listed within Hazel Grove. Party Wall Act requirements may still apply to works such as extensions, loft conversions and excavation close to neighbouring buildings.

Hazel Grove area stats
Local knowledge

Homes and party walls in Hazel Grove

Hazel Grove has a mix of semi-detached, detached and terraced homes, including older properties alongside more modern housing. Extensions, loft conversions and alterations are common types of work that can bring the Party Wall etc. Act 1996 into consideration.

Projects we see most in Hazel Grove

  • Single-storey rear extensions
  • Loft conversions
  • Two-storey side extensions
  • Adjacent excavation

How a party wall instruction works

  1. Project reviewDrawings and scope checked against sections 1, 2 and 6.
  2. Notice strategyWhich neighbours, which notices and when, to protect your programme.
  3. Serve noticesCorrectly drafted notices served on every adjoining owner.
  4. Schedule & awardThe neighbour's property recorded and the award agreed.
  5. Close-outPost-works check and sign-off.
Party Wall · for homeowners

Planning a project in Hazel Grove?

Which home improvements need a notice under the Party Wall etc. Act 1996

Rear extension

Needs notice if you build a new wall on or astride the boundary, or dig foundations within 3 m of a neighbour's building and deeper than theirs.

Sections 1 & 6Often

Side extension

Side returns and wrap-arounds usually sit on the boundary line and need new foundations right next to the neighbour's.

Sections 1 & 6Usually

Loft conversion

Cutting steel beams into the party wall, raising it or removing a shared chimney breast is work to a party wall.

Section 2Usually

Basement

Digging below your neighbour's foundations, and underpinning a shared wall, are both notifiable.

Sections 2 & 6Almost always

Excavation

Foundations, piling or deep drainage within 3 m of a neighbour's building, or within 6 m for deeper digs, can need notice.

Section 6Depends on depth

Structural alterations

Inserting beams into a shared wall, cutting in flashings or taking out a chimney breast on the party wall.

Section 2Usually
  • 1 month notice for new walls at the boundary and excavation
  • 2 months notice for work to an existing party wall
  • 14 days for the neighbour to reply
For professionals

Architects, designers & referrers

Bring Party Wall advice in at design stage, not after tender

Architects & design professionals

Residential architects, architectural technologists, designers, planning consultants, structural engineers and design-and-build practices.

  • Preliminary Party Wall assessments
  • Early identification of project risk
  • Technical guidance on notifiable works
  • CPD and educational sessions
  • A reliable referral pathway for your clients

Builders, surveyors & solicitors

Refer a client and we take notices, schedules of condition and awards off your programme.

  • Builders
  • Extension specialists
  • Loft conversion contractors
  • Surveyors
  • Solicitors
  • Project managers
  • Construction consultants
Adjoining owners

Received a Party Wall notice?

Your neighbour in Hazel Grove is planning work

You have 14 days to reply. If you don't, a dispute is assumed and surveyors are appointed. Your three options:

  1. ConsentAgree to the work. A schedule of condition is still wise.
  2. Agreed surveyorDissent and share one impartial surveyor.
  3. Own surveyorDissent and appoint your own surveyor.

The building owner normally pays the surveyors' reasonable fees, and must make good any damage the works cause.

Get impartial advice from Corelain
Quick answers

Party Wall questions in Hazel Grove

Based on the Party Wall etc. Act 1996

Do I need a Party Wall agreement for an extension in Hazel Grove?

Not every extension needs a Party Wall agreement. However, you may need to serve a Party Wall notice if the work involves building on or at the boundary, carrying out certain works to a party wall, or excavating close to a neighbouring building. If your neighbour consents in writing, a Party Wall Award is not normally required.

Does a detached house in Hazel Grove ever need a Party Wall notice?

Yes. A detached house can still require a Party Wall notice even if there is no shared wall. For example, section 6 may apply where excavation is within 3 metres of a neighbouring building and extends below the level of the neighbour's foundations.

Do I need a Party Wall notice for a loft conversion?

It depends on the proposed work. A notice will often be required where a loft conversion involves cutting into a party wall to insert beams or other structural supports. A loft conversion does not automatically require notice, so the proposed works need to be considered.

How close can I excavate to my neighbour's property?

Section 6 may apply where excavation is within 3 metres of a neighbouring building and extends below the level of its foundations. It can also apply within 6 metres for sufficiently deep excavations, depending on the depth and position of the proposed foundations in relation to the neighbouring building.

How much notice do I need to give my neighbour?

Generally, at least one month's notice is required for building a new wall on or at the boundary and for adjacent excavation. At least two months' notice is generally required for notifiable work to an existing party structure. Notices normally cease to have effect if the work has not started within 12 months.

What happens if my neighbour does not reply to a Party Wall notice?

If an adjoining owner does not respond within the relevant 14-day period, a dispute may be deemed to have arisen. The surveyor appointment procedure can then begin so that the notifiable works can be dealt with through a Party Wall Award.

Who pays the Party Wall surveyor's fees?

The building owner carrying out the work will usually pay the reasonable surveyor's fees arising from the notifiable works. This will commonly include the reasonable fees of the adjoining owner's surveyor where a separate surveyor is appointed.

I have received a Party Wall notice in Hazel Grove. What should I do?

Check what work is proposed and which notice has been served. You can consent in writing or dissent. If a dispute arises, both owners can appoint one agreed surveyor, or each owner can appoint a separate surveyor.

Do I have to pay for my own Party Wall surveyor as an adjoining owner?

Usually not where the proposed works are solely for the building owner's benefit. The building owner will normally be responsible for the adjoining owner's reasonable surveyor's fees, although responsibility for costs ultimately depends on the circumstances.

What happens if my neighbour's building work damages my property?

A Schedule of Condition can record the condition of your property before the notifiable works start. If damage is caused by works carried out under the Party Wall Act, the building owner may be required to make good the damage or, where appropriate, pay compensation.

Does planning permission mean I don't need a Party Wall notice?

No. Planning permission, Building Regulations approval and the Party Wall process are separate. Having planning permission does not remove the requirement to serve a Party Wall notice where the proposed works are notifiable.

Greater Manchester

Party Wall surveyors across Trafford and Stockport

Local Party Wall guides for each focus area

All Trafford All Stockport