Rear extension
Needs notice if you build a new wall on or astride the boundary, or dig foundations within 3 m of a neighbour's building and deeper than theirs.
Visit Corelain
Hazel Grove is a popular residential area within Stockport, centred around the A6 and well connected to Stockport and Manchester. We provide Party Wall advice to building owners and adjoining owners across Hazel Grove and the surrounding area.
No conservation areas are listed within Hazel Grove. Party Wall Act requirements may still apply to works such as extensions, loft conversions and excavation close to neighbouring buildings.
Hazel Grove area statsHazel Grove has a mix of semi-detached, detached and terraced homes, including older properties alongside more modern housing. Extensions, loft conversions and alterations are common types of work that can bring the Party Wall etc. Act 1996 into consideration.
Which home improvements need a notice under the Party Wall etc. Act 1996
Needs notice if you build a new wall on or astride the boundary, or dig foundations within 3 m of a neighbour's building and deeper than theirs.
Side returns and wrap-arounds usually sit on the boundary line and need new foundations right next to the neighbour's.
Cutting steel beams into the party wall, raising it or removing a shared chimney breast is work to a party wall.
Digging below your neighbour's foundations, and underpinning a shared wall, are both notifiable.
Foundations, piling or deep drainage within 3 m of a neighbour's building, or within 6 m for deeper digs, can need notice.
Inserting beams into a shared wall, cutting in flashings or taking out a chimney breast on the party wall.
Bring Party Wall advice in at design stage, not after tender
Residential architects, architectural technologists, designers, planning consultants, structural engineers and design-and-build practices.
Refer a client and we take notices, schedules of condition and awards off your programme.
Your neighbour in Hazel Grove is planning work
You have 14 days to reply. If you don't, a dispute is assumed and surveyors are appointed. Your three options:
The building owner normally pays the surveyors' reasonable fees, and must make good any damage the works cause.
Get impartial advice from CorelainBased on the Party Wall etc. Act 1996
Not every extension needs a Party Wall agreement. However, you may need to serve a Party Wall notice if the work involves building on or at the boundary, carrying out certain works to a party wall, or excavating close to a neighbouring building. If your neighbour consents in writing, a Party Wall Award is not normally required.
Yes. A detached house can still require a Party Wall notice even if there is no shared wall. For example, section 6 may apply where excavation is within 3 metres of a neighbouring building and extends below the level of the neighbour's foundations.
It depends on the proposed work. A notice will often be required where a loft conversion involves cutting into a party wall to insert beams or other structural supports. A loft conversion does not automatically require notice, so the proposed works need to be considered.
Section 6 may apply where excavation is within 3 metres of a neighbouring building and extends below the level of its foundations. It can also apply within 6 metres for sufficiently deep excavations, depending on the depth and position of the proposed foundations in relation to the neighbouring building.
Generally, at least one month's notice is required for building a new wall on or at the boundary and for adjacent excavation. At least two months' notice is generally required for notifiable work to an existing party structure. Notices normally cease to have effect if the work has not started within 12 months.
If an adjoining owner does not respond within the relevant 14-day period, a dispute may be deemed to have arisen. The surveyor appointment procedure can then begin so that the notifiable works can be dealt with through a Party Wall Award.
The building owner carrying out the work will usually pay the reasonable surveyor's fees arising from the notifiable works. This will commonly include the reasonable fees of the adjoining owner's surveyor where a separate surveyor is appointed.
Check what work is proposed and which notice has been served. You can consent in writing or dissent. If a dispute arises, both owners can appoint one agreed surveyor, or each owner can appoint a separate surveyor.
Usually not where the proposed works are solely for the building owner's benefit. The building owner will normally be responsible for the adjoining owner's reasonable surveyor's fees, although responsibility for costs ultimately depends on the circumstances.
A Schedule of Condition can record the condition of your property before the notifiable works start. If damage is caused by works carried out under the Party Wall Act, the building owner may be required to make good the damage or, where appropriate, pay compensation.
No. Planning permission, Building Regulations approval and the Party Wall process are separate. Having planning permission does not remove the requirement to serve a Party Wall notice where the proposed works are notifiable.