Rear extension
Needs notice if you build a new wall on or astride the boundary, or dig foundations within 3 m of a neighbour's building and deeper than theirs.
Visit Corelain
Heaton Moor is a popular residential area north of Stockport, known for its Victorian character and established residential streets. We provide Party Wall advice to building owners and adjoining owners across Heaton Moor and the surrounding area.
Article 4 Directions apply within parts of the Heaton Moor and Mauldeth Road Conservation Areas, meaning some works that would otherwise be permitted development may require planning permission. Party Wall requirements are separate and depend on the proposed works.
Heaton Moor area statsHeaton Moor has a mix of terraced, semi-detached and detached homes, including many older properties alongside later housing. Extensions, loft conversions and alterations are common types of work that can bring the Party Wall etc. Act 1996 into consideration.
Which home improvements need a notice under the Party Wall etc. Act 1996
Needs notice if you build a new wall on or astride the boundary, or dig foundations within 3 m of a neighbour's building and deeper than theirs.
Side returns and wrap-arounds usually sit on the boundary line and need new foundations right next to the neighbour's.
Cutting steel beams into the party wall, raising it or removing a shared chimney breast is work to a party wall.
Digging below your neighbour's foundations, and underpinning a shared wall, are both notifiable.
Foundations, piling or deep drainage within 3 m of a neighbour's building, or within 6 m for deeper digs, can need notice.
Inserting beams into a shared wall, cutting in flashings or taking out a chimney breast on the party wall.
Bring Party Wall advice in at design stage, not after tender
Residential architects, architectural technologists, designers, planning consultants, structural engineers and design-and-build practices.
Refer a client and we take notices, schedules of condition and awards off your programme.
Your neighbour in Heaton Moor is planning work
You have 14 days to reply. If you don't, a dispute is assumed and surveyors are appointed. Your three options:
The building owner normally pays the surveyors' reasonable fees, and must make good any damage the works cause.
Get impartial advice from CorelainBased on the Party Wall etc. Act 1996
A Party Wall Notice may be required if the extension involves building a new wall on or astride the boundary, carrying out works to an existing party wall, or excavating close to a neighbouring building and below the level of its foundations. Whether notice is required depends on the design, location and depth of the proposed works.
Not every loft conversion requires notice. However, notice is commonly required where the works involve cutting into a party wall to insert steel beams or padstones, raising a party wall or carrying out other structural alterations to the party structure.
Read the notice carefully and check what works are proposed. You can consent in writing or dissent. If a dispute arises, you can agree to the appointment of one Agreed Surveyor or appoint your own Party Wall Surveyor.
“Party wall agreement” is a commonly used term, but it is not a specific document under the Party Wall etc. Act 1996. Where notifiable work is proposed, a Party Wall Notice is served. The adjoining owner can consent in writing or, if a dispute arises, the appointed surveyor or surveyors can resolve matters through a Party Wall Award.
That depends on the proposed works and whether you are comfortable with the information provided. Before consenting, you can ask for further details about the works. Consent does not remove the building owner's responsibility for damage caused by the notifiable works.
For a Party Structure Notice, if you do not consent within 14 days, a dispute is deemed to have arisen under the Act. The surveyor appointment process can then begin. The precise procedure depends on the type of notice served.
Not necessarily. Where a dispute arises, you and the building owner can agree to appoint one Agreed Surveyor, or each owner can appoint a separate surveyor. An appointed Party Wall Surveyor's role is to act impartially under the Act rather than simply represent one owner's interests.
Where the works are solely for the building owner's benefit, the building owner will normally pay the reasonable costs of the Party Wall process, including the adjoining owner's surveyor where a separate surveyor is reasonably appointed. The surveyors can determine responsibility for costs where circumstances differ.
A Party Wall Award is the document made by the appointed surveyor or surveyors where a dispute has arisen. It sets out the works covered by the Award and how certain Party Wall matters are to be dealt with, which can include access, working arrangements and making good damage.
A Schedule of Condition records the condition of the adjoining property before the notifiable works begin, usually with written descriptions and photographs. It provides a useful record of existing cracks and defects if damage is alleged during or after the works.
Report the damage promptly and keep photographs or other evidence. Where damage has resulted from works carried out under the Act, the building owner may be required to make good the damage or, in relevant circumstances, provide compensation. A pre-works Schedule of Condition can help establish whether damage is new.
The Party Wall etc. Act 1996 does not normally give an adjoining owner the right to prevent lawful building work simply because they object to it. Instead, the Act provides a process for certain works to proceed while protecting the interests of adjoining owners. Planning permission and Party Wall requirements are separate matters.